Installing the Oxygen Cylinder, Regulator and Hoses

Install the first stage onto the cylinder oriented as shown in figure 27.

Clip the scrubber canister cover clips together and tighten the straps to snug the cover around the scrubber. The cylinder can now be mounted to the bottom of the cover using the two cam straps. Orient the cylinder with the first stage to the diver’s right and facing up as shown in Figure 28.

Route the green hose of the hose assembly through the daisy chain and thread it onto the solenoid fitting (See Figure 29). This connection only needs to be hand tight.

Route the black BC hose through the daisy chain and connect it to the oxygen MAV. Then thread the hose from the first stage through the daisy chain, connect it to the “y” block, and install the lock clip as shown in Figure 30. Ensure that the second black hose is plugged into the Oxygen Manual Add Valve

 

Scroll to Top